HAWAX CORPORATION
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

  • Home
  • Services
    • Oil & Gas
    • Airport
    • Security
    • Media
  • About Us
    • Who Are We
    • Meet Our Team
    • What We Do
  • Our Work
  • Downloads
  • More
    • Home
    • Services
      • Oil & Gas
      • Airport
      • Security
      • Media
    • About Us
      • Who Are We
      • Meet Our Team
      • What We Do
    • Our Work
    • Downloads
HAWAX CORPORATION

Signed in as:

filler@godaddy.com

  • Home
  • Services
    • Oil & Gas
    • Airport
    • Security
    • Media
  • About Us
    • Who Are We
    • Meet Our Team
    • What We Do
  • Our Work
  • Downloads

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

OUR WORK

Hawax has an extensive experience across various services within Iraq. 

EPC –Treatment Plant

Engineering, Procurement, Construction and Installation of Oily Water Treatment Plant

  • Description: Engineering, Procurement, Construction and painting of Storage Tanks
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: On-Going

EPC –Desalter Project

Desalter Project, Khurmala KRI

  • Description: Engineering, Procurement, Supply, Supervision of Commissioning and Start-up with all Accessories of Process Equipment Package for Upgrading of Wet Crude Oil Treatment System in CPS -1, Khurmala.
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: On Going 

EPC –Water & Oil Tanks

Fabrication and Installation of T-0400F Oil Storage Tank

4000 M3 Water Storage Tank, Middle Station, Khurmala Dome

4000 M3 Water Storage Tank, Middle Station, Khurmala Dome

  • Description: Engineering, Procurement, Construction, and painting of Storage Tanks
  • Client: Hunt Oil
  • Location: Ain Sifni, KRI
  • Status: Completed 2020

4000 M3 Water Storage Tank, Middle Station, Khurmala Dome

4000 M3 Water Storage Tank, Middle Station, Khurmala Dome

4000 M3 Water Storage Tank, Middle Station, Khurmala Dome

  • Description: Engineering, Procurement, Construction and painting of Storage Tanks
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2019

3000 M3 Water Storage Tank, Middle Station, Khurmala Dome

4000 M3 Water Storage Tank, Middle Station, Khurmala Dome

  • Description: Engineering, Procurement, Construction and painting of Storage Tanks 
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2018

EPC - 1000m3 Process Tank

EPC - 1000m3 Process Tank 2

Description: Engineering, Procurement, Construction of Process Tanks
Client: KAR
Location: Khurmala,

Description: Engineering, Procurement, Construction of Process Tanks

Client: KAR

Location: Khurmala, KRI

Status: On-going

EPC - 1000m3 Process Tank 2

EPC - 1000m3 Process Tank 2

EPC - 1000m3 Process Tank 2

Description: Engineering, Procurement, Construction of Process Tanks
Client: KAR
Location: Khurmala,

Description: Engineering, Procurement, Construction of Process Tanks

Client: KAR

Location: Khurmala, KRI

Status: On-going

EPC - 2000m3 Process Tank 3

EPC - 1000m3 Process Tank 2

EPC - 1000m3 Process Tank 2

Description: Engineering, Procurement, Construction of Process Tanks
Client: KAR
Location: Khurmala, KRI
Status: On-going

Piping

Tawke Produced Water Separation –Construction & Installation Works

Tawke Produced Water Separation –Construction & Installation Works

Tawke Produced Water Separation –Construction & Installation Works

  • Description: PROVISION OF CONSTRUCTION AND INSTALLATION WORKS FOR TAWKE PRODUCED WATER SEPARATION PHASE 2
  • Client: DNO
  • Location: Tawke, KRI
  • Status: Completed 2021

TAWKE FIREWATER UPGRADE –PHASE 2

Tawke Produced Water Separation –Construction & Installation Works

Tawke Produced Water Separation –Construction & Installation Works

  • Description: Construction, Structural Mechanical and Piping Works for TAWKE FIREWATER UPGRADE –PHASE 2
  • Client: DNO
  • Location: Tawke, KRI
  • Status: Delivered 2021

PF1 Train 2 Interconnecting Works(Mechanical Work T1.5)

Tawke Produced Water Separation –Construction & Installation Works

  • Description: Procurement, Construction and painting PF1 TRAIN 1.5
  • Client: Hunt Oil
  • Location: Sifni Block, KRI
  • Status: Completed 2020

PF1 TRAIN 2 AND TANKS INTERCONNECTING WORKS

  • Description: Engineering, Procurement, Construction and painting PF1 TRAIN 2 AND TANKS INTERCONNECTING WORKS
  • Client: Hunt Oil
  • Location: Sifni Block, KRI
  • Status: Completed 2020

Export Pipeline system from PF1 to RETM

Export Pipeline system from PF1 to RETM

  • Description: Piping Construction From ¾” to 16” piping line
  • Client: GKPI  (Sub-contractor to KAR) 
  • Location: Lalish, Sheikhan, KRI
  • Status: Completed 2019

Export Pipeline system from RETM (SPIT)

Export Pipeline system from PF1 to RETM

  • Description: Piping Construction From ¾” to 12” piping line
  • Client: HKN (Sub-contractor to KAR)
  • Location: Kanika, Atrush, KRI
  • Status: Completed 2019

Export Pipeline system from RETM (SPRT)

Export Pipeline system from RETM (SPRT)

Export Pipeline system from RETM (SPRT)

  • Description: Piping Construction From ¾” to 24” piping line
  • Client:  HKN (Sub-contractor to KAR) 
  • Location: Bvian, Sheikhan, KRI
  • Status: Completed 2019

Export Pipeline system from RETM (GKRT)

Export Pipeline system from RETM (SPRT)

Export Pipeline system from RETM (SPRT)

  • Description: Piping Construction From ¾” to 16” piping line
  • Client: GKPI
  • Location: Bvian, Sheikhan, KRI
  • Status: Completed 2019

RETM & KPS2 Piping

Export Pipeline system from RETM (SPRT)

RETM & KPS2 Piping

  • Description: Spool Fabrication & Painting, Spool Erection, Valve Insolation , Underground Piping, Structural Steel Fabrication & Painting, Structural Steel Erection
  • Client: Taqa
  • Location: Atrush, KRI
  • Status: Completed 2017

Pipelines

NG Wellhead to GPS1 Manifold-KDM29

NG Wellhead to GPS1 Manifold-KDM29

NG Wellhead to GPS1 Manifold-KDM29

  • Description: Construction of 8” Crude oil pipeline –6.2 Km
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2019

NF Wellhead to GPS1 Manifold-KDM28

NG Wellhead to GPS1 Manifold-KDM29

NG Wellhead to GPS1 Manifold-KDM29

  • Description: Construction of 8” Crude oil pipeline -1.7 Km
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2019

Construction of 20’’ Gas Pipeline

NG Wellhead to GPS1 Manifold-KDM29

  • Description: Right of Way (ROW), Stringing, Bending, Welding, Lowering, Casing / Road crossing, Tie-ins 
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2018

Construction of 12’’ Oil Pipeline

  • Description: Right of Way (ROW), Stringing, Bending, Welding, Lowering, Casing / Road crossing, Tie-ins
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2018

12” Feeder line Atrush Pipeline

12” Feeder line Atrush Pipeline

  • Description: Pre-construction Drainage , Right of Way (ROW), Stringing, Welding, Trenching Critical point crossing, Water crossing, Road crossing, Trenching, Bedding, Lowering, Back filling Fiber Optic Cable and conduit 
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2017

Pit Remediation

Oil and Overflow PITs Remediation Project

  • Description: Pits Remediation “Oil Pit (3150m3)” and “Overflow Pit (2300m3)
  • Client: KAR
  • Location: Khurmala, KRI
  • Status: Completed 2019

Flare Projects

Provision of HP and LP Flare -CPS1 Station

  • Description: Engineering and Procurement of HP and LP Flare
  • Location: Khurmala, KRI
  • Status: Completed 2021

Flare Projects

Provision of Manpower, Equipment and Services

  • Description: Provision of Manpower, Equipment and Services such as Mechanical, Electrical, Instrument, Piping, Civil etc.
  • Client: Hunt Oil
  • Location: Kurdistan Region of Iraq
  • Status: On Going

Logistics

Rig Move 941 Shakruk to Pires

  • Description: Mobilizing, Installing and Demobilizing main camp, Rig Site with all related tools and equipment.
  • Client: Ensign International Energy Services Pty Ltd.
  • Location: Shakruk, KRI
  • Status: Completed 2014

Other Logistic Services

We have executed over 200 large logistic projects to most of the operatiors in the MEA. It is in Hawax's moto to be efficient, fast and a reliable logistic partner.

Life Support(Camp Provision, Catering, Maintenance, Camp Ser

Peris-1 Site –expats 120man camp

350 Manpower Camp, Catering & Services for Sarta Rovi Chevron

Parker RIG man camp at Shireen Mountain

  • Description: Catering and OPF life support, Site preparation and construction, Heavy machinery and light Machinery, Fuel supply, Road Maintenance, Water pipeline supply, Security
  • Client: HESS
  • Location: Peris, KRI
  • Status: Completed 2015

Parker RIG man camp at Shireen Mountain

350 Manpower Camp, Catering & Services for Sarta Rovi Chevron

Parker RIG man camp at Shireen Mountain

  • Description: Drilling, Heavy and Light Machinery Equipment, Preparation of documents and Payout
  • Client: Parker Drilling
  • Location: Shereen, KRI
  • Status: Completed 2015

350 Manpower Camp, Catering & Services for Sarta Rovi Chevron

350 Manpower Camp, Catering & Services for Sarta Rovi Chevron

350 Manpower Camp, Catering & Services for Sarta Rovi Chevron

  • Description: Engineering, Procurement, Construction and painting of Storage Tanks 
  • Client: Global Geophysical Services Ltd
  • Location: Sarta, KRI
  • Status: Completed 2015

Parker –Hess 180 RIG man camp

OPF RIG 160man camp –Harir Mountains

350 Manpower Camp, Catering & Services for Sarta Rovi Chevron

  • Description: Catering and life support, Heavy machinery and Light Machinery, Fuel supply, Road Maintenance, Water Tanks Trucks & pipeline supply
  • Client: Parker Drilling 
  • Location: Shereen, KRI
  • Status: Completed 2015

Mirawa expats 120man RIG camp

OPF RIG 160man camp –Harir Mountains

OPF RIG 160man camp –Harir Mountains

  • Description: Catering and life support, cabin and containers fabrication, site preparation OPF life support, construction, Heavy machinery and Light Machinery, Fuel supply
  • Client: Marathon Oil 
  • Location: Mirawa, KRI
  • Status: Completed 2014

OPF RIG 160man camp –Harir Mountains

OPF RIG 160man camp –Harir Mountains

OPF RIG 160man camp –Harir Mountains

  • Description: Catering and OPF life support, cabin and containers prefabrication, site preparation, construction, Heavy and Light machinery, Fuel supply.
  • Client: Marathon Oil 
  • Location: Harir, KRI
  • Status: Completed 2014

Kani-bote expats 80man camp

Shireen-1 Site –expats 180man camp

80 expats man camp –Safin Rig

  • Description: Catering and OPF life support, Prefabrication cabin and containers, site preparation and construction, Heavy and light Machinery, Fuel supply, Road Maintenance, Water pipeline supply.
  • Client: Hess
  • Location: Kani-Bote, KRI
  • Status: Completed 2014

80 expats man camp –Safin Rig

Shireen-1 Site –expats 180man camp

80 expats man camp –Safin Rig

  • Description: Catering and OPF life support, cabin and containers fabrication, site preparation and construction, Heavy and Light Machinery, Fuel supply
  • Client: Marathon Oil
  • Location: Safin, KRI
  • Status: Completed 2014

Shireen-1 Site –expats 180man camp

Shireen-1 Site –expats 180man camp

Shireen-1 Site –expats 180man camp

  • Description: Catering and OPF life support, Site preparation and construction, Heavy and Light Machinery, Fuel supply, Road Maintenance, Water pipeline supply.
  • Client: Hess
  • Location: Shireen, KRI
  • Status: Completed 2014

Photo Gallery

    Our Partners

    Hawax Corporation

    Empire World, Empire World Complex, Erbil, Iraq

    +9647501901146

    Copyright © 2025 Hawax Corporation - All Rights Reserved.

    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept