Oil and Overflow PITs Remediation Project

Client: KAR Group

Scope of Work: Pits Remediation “Oil Pit (3150m3)” and “Overflow Pit (2300m3)”. Remediate and encapsulate exist contaminated drill cuttings and solids. Back fill the lined disposal pit treated cuttings, cover the disposal pit with GCL liner then 0.5 m height of native soil, Land Scape, Remove the fence and level the site.